Future fusion power reactors such as the UK’s STEP reactor, due to begin construction in the next 10 years, will require the tritium fuel to be generated (bred), extracted, separated, and regenerated into new fueling (either pellets or gas) prior to (re-)introduction into the fusion core.
Read more