Don't miss our weekly PhD newsletter | Sign up now Don't miss our weekly PhD newsletter | Sign up now

  Telescope Scheduling


   Faculty of Engineering

This project is no longer listed on FindAPhD.com and may not be available.

Click here to search FindAPhD.com for PhD studentship opportunities
  Assoc Prof Oliver Sinnen  Applications accepted all year round  Competition Funded PhD Project (Students Worldwide)

About the Project

Telescopes observe celestial objects(or sources) in the sky. The telescopes are usually movable and can point at different positions in the sky. Very large scientific telescopes in astronomical observatories are highly specialised, very expensive and scarce. Hence, they must be used as efficiently as possible, so that as many observations can be made as possible during any given time frame.

In a typical operation mode, a telescope will be configured to observe a given list of sources, which correspond to positions in the sky. It remains pointed at a source of the list for a certain observation period, e.g. 10 minutes, after which the telescope is rotated and tilted to point to the next object on the list. This so called slewing can take up to several minutes for very large telescopes. During the time of this movement, the telescope is not gathering data. To optimise the use of the telescope, it is desirable to order the sources in such a way that the slewing time is minimsied. Given the rotation of the Earth, almost all sources are only visible during certain time periods, which is a constraint that needs to be taken into consideration.

There are further aspects that can make this ordering or scheduling of observations more difficult. For example, the necessary observation period can change depending on the position in the sky. Or the fact that certain inclination and rotation angles of the telescope need to be avoided.

The objectives of this research project are to discover and design novel optimisation algorithms for the scheduling of telescope observations. This will be based on existing models, but at the same time new models will be considered, especially in the context of multi-criteria optimisation.

The following knowelge and skills will be very helpful in this project:

  • algorithm design and analysis
  • optimisation
  • basic programming
  • basic astronomy

This project will be conducted in collaboration with A/Prof Willem van Straten, Auckland University of Technology (AUT).

 About the Project